header
 
t_name_biddings
BIDDING 11
 
INVITATION TO APPLY FOR ELIGIBILITY AND TO BID
 

The Davao City Water District (DCWD) through its Bids and Awards Committee-A (BAC-A), invites suppliers / manufacturers / distributors / contractors to apply for eligibility and to bid for the hereunder project:

 PACKAGE

 DESCRIPTION

APPROVED BUDGET FOR THE CONTRACT (ABC)

COST OF BID DOCUMENTS

1

Various Sizes Straight Meter Valves with Lockwing

P 2,325,000.00

P 2,000.00

2

Copper to Copper with Stopper, ¾” Brass Compression Type

P 1,322,600.00

P 1,500.00

3

Gate Valves, 6” & 8”

P 816,800.00

P 1,000.00

4

Gate Valves, 2”, 4” & 10”

P 926,200.00

P 1,000.00

5

Various Sizes P. E. Pipes

P 701,300.00

P1,000.00

6

160 pieces 350mm Mortar Lined Cement Coated Steel Pipe

P 4,641,600.00

P 3,000.00

7

Ten (10) units Production Flow Meter 8” diameter with Accessories including one (1) data logger device (for the 10 units)

P 1,250,000.00

P 1,500.00

8

Twenty (20) pieces Stainless Steel Lineshaft 1-11/16” diameter x 10 feet long, ASTM SS 316

P 1,100,000.00

P 1,500.00

9

Two (2) pieces Horizontal Split Pump Impeller, Type 10AE1G, Size 10 x 12 x 16, 1775 RPM

P 1,300,000.00

 

P 1,500.00

10

Supply Labor and Materials for Twenty Six (26) pieces Chinese Gold Bracelet with I.D. Bar, 18K, 19.4 grams

P 884,000.00

 

P 1,000.00

11

Supply Labor and Materials for Thirty Four (34) pieces Chinese Gold Company Ring, 18K, 12 grams

P 816,000.00

P 1,000.00

12

Supply  Labor and Materials for Twenty Five (25) pieces Chinese Gold Pendant, 14K, 5 grams and Twenty Five (25) pieces Chinese Gold Necklace, 18K, 5 grams, 22 inches 

P 450,000.00

P 1,000.00

For contracts involving delivery of goods:

Prospective bidders should have experience in undertaking a similar project within the last 5 years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary “pass/fail” criteria.  Post-qualification of the lowest calculated bid shall be conducted.

All particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulation (IRR).  

The complete schedule of activities is listed, as follows:

Activities Schedule
1. Issuance of Bid Documents Starting July 22, 2010; 8:00 A.M. to 5:00 P.M.
2. Pre-Bid Conference August 5, 2010; 9:00 A.M.

3. Opening of Bids

August 17, 2010; 9:00 A.M. (for Package 1 to 6)
August 18, 2010; 9:00 A.M. (for Package 7 to 12)

Bid Documents will be available only to prospective bidders upon payment of a non-refundable amount as stated above to the Davao City Water District’s Cashier.

The Davao City Water District reserves the right to reject any or all the bids, waive any required formality and accept the offer most advantageous to the government.  The Davao City Water District likewise assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid.

Approved by:

 

ENGR. EDWIN V. REGALADO
       Chairperson, BAC-A

Date of Publication: July 22, 2010
Newspaper: Manila Bulletin and Philippine Star

 
bg_bottom